Tooling Design and Fabrication

Tool projects with quick-turnaround

We manufacture to your standards for tool design and maintenance and keep a reliable open communication link during tool manufacturing.

Why choose Eastek?

Let us help you reach your goals

Wide Range of Solutions

Our advanced on-site tool fabrication facility allows us to design for manufacturability (DFM) through a wide range of solutions.

In-house Mold Shop

Utilizing our in-house mold shop with a quality design, our toolmakers can build a mold to decrease costs and improve output.

Highly Skilled Toolmakers

Our team design and build high-precision molds to optimize plastic injection molding performance and tool longevity.

Tooling Project Management

We manufacture to your standards for tool design, maintenance & keep a reliable open communication link.

On-time and To Specification

Using several reliable mold manufacturing suppliers ensures that the mold is delivered on time.

Comprehensive Tooling Supply Chain

We manage outsourced tooling for all common molding and fixturing technologies and materials.

Deliver timely & cost-effective products

We are agile, easy to reach and communicate with while keeping quality and personal touch as our priority.

Tool Fabrication Capabilities

  • On-site tool fabrication
  • Single cavity, multi-cavity, and family tools
  • Six weeks standard lead time with expedited timelines available
  • Mold base and inserts designed to run from 50,000 to 1,000,000 shots
  • Complete on-site tool metrology lab

Certified production facilities and dedicated staff

Our mission is to provide our customers with the expert solutions to build the products that matter to them.

Your trusted choice for global contract manufacturing

0

Years Industry Experience

0

Manufacturing Facilities Worldwide

0

Average Years of Partnerships

0

Company Employees

Case Studies

Injection Molded Plastics

Eastek took on a start-up company with a novel design for masks for patient intubation and anesthesia.

It is a long established fact that a reader will be distracted by the readable content of a page when looking at its layout.

Lorem Ipsum

Turnkey Assemblies

Launching a second generation product that would ramp from 400k pieces to several million in 12 months during the midst of a pandemic.

It is a long established fact that a reader will be distracted by the readable content of a page when looking at its layout.

Lorem Ipsum

Printed Circuit Board Assemblies

A Fortune 300 life sciences company wanted to change contract manufacturers due to quality and delivery issues.

"Without Eastek's extensive Engineering team and being able to reverse engineer all of our boards, we would have spent time, energy, and money in legal fees and wouldn't be as far as we are today."

General Council

Custom Battery Pack Solution

A multinational medical technology company needed a robust battery solution that would improve cycle life of the battery and provide all-day, high-power performance.

"Eastek was able to educate and guide us on what the best battery technology would be for our applications. They were an essential part of making sure multiple products functioned with the same battery."

Chief Technology Officer

We’ve Lost our IP

Eastek was able to reverse engineer the customers product line, enabling them to regain control of their IP for the first time in 20 years.

"Without Eastek, I'm not sure how we would have continued forward. Not only were we able to continue future generations of our product, but we now have our IP back in our hands and under our control."

Vice President of Engineering

Our Process

01

Concept Introduction

We'll consult to discuss your goals, budget, timeline, and specifications to find the best solution for you.

02

Design Review & Feedback

Our engineers will start developing your product with high quality materials that fit your specific requirements.

03

Production and Distribution

Our team will produce and distribute your product with quality control measures, meeting high standards.

04

Design & Manufacturing
Optimization & Cost Reduction

Our team will collaborate with you to optimize the design for cost savings and maximum production reliability.

05

Lifecycle Management

Our customer experience team cares for your product even after launch.

Frequently asked questions

Tool design and fabrication is the process used to produce a mold for use in plastic injection molding.

Eastek offers warranties from 1,000 to 1,000,000 shots.

Yes, Eastek has successfully built thousands of tools in house.

Yes, Eastek offers tooling transfer services.

Yes, Eastek offer fast turnaround mold tooling with lead-times starting at 2 weeks.

Let’s build what matters to you!